Fee: $Material is free but there may cost associated with environmental protection measures
Type of Fill: Soil
Delivery Options: Pickup Available
Date Available: November 23, 2021
Description:
100,000 CY material from dredging of Lake O"Neill on southern side of MCB Csmp Pendleton. Material is approximately 10 miles from San Luis Rey Base gate. Material has dewatering and been characterized. Samples were analyzed for partial size distribution, percent moisture, ash, organics, total organic carbon with addition testing for heavy metals, mercury, nitrate, orthophosphate and VOC's. Material found to be clean. An additional 100,000 CY may also be available at same location of the same material.
Location of Fill: Your location is needed to show this content.